Evidence
Behaviour is measured on hardware and recorded, not asserted.
T · [CLIENT TO PROVIDE] E · [CLIENT TO PROVIDE]
The range
Each service page explains the work in engineering terms: what is decided, what is produced and what evidence comes out of it.
Circuit-level engineering, board design and physical hardware architecture.
The software layer engineered against real silicon and real boards.
System architecture across hardware and software.
Open →Device control, drivers and real-time behaviour.
Open →Application layers on constrained platforms.
Open →Board support, kernel and userspace engineering.
Open →Deterministic scheduling and real-time control.
Open →Programmable logic for timing-critical functions.
Open →Devices that communicate reliably with systems, networks and data.
Continuity from first concept through to repeatable production.
Concept to production-ready electronics.
Open →Verification across hardware and firmware.
Open →Functional and reliability testing of built units.
Open →Extending the life of existing electronics.
Open →Documentation, tooling and build packs.
Open →DFM, supplier and build coordination.
Open →How to choose
Most enquiries arrive in one of these four shapes. Any of them is a reasonable place to begin.
The programme starts with requirements and architecture: what the product must do, what it must survive, what it must prove and what it must cost. Only then are components chosen.
Start here
Best entry point: electronic product development.
Noise, thermal behaviour, yield, cost or reliability is not where it needs to be. We measure first, find where the constraint actually sits, and change the layer where the fix is cheapest.
Start here
Best entry point: hardware engineering or PCB design.
Components are obsolete, the toolchain is unsupported or the design data is incomplete. Modernisation restores buildability while keeping the behaviour customers already rely on.
Start here
Best entry point: product modernisation.
Documentation, test coverage, fabrication data and supplier questions decide whether the first build goes smoothly. Production readiness turns a working prototype into a repeatable product.
Start here
Best entry point: production readiness.
Adjacent
However a programme starts, these do not change.
Behaviour is measured on hardware and recorded, not asserted.
Design data, source and documentation are handed over to you.
Buildability is considered from the first design decision.
The same engineers carry the requirement through to handover.
Next step
Describe the product and the problem. We will tell you which disciplines are involved — and which ones are not.